Skip to content

Commit bc63e76

Browse files
committed
[bot:gitfix] docs: strengthen archive banner to disclaim historical step numbers
Third-pass audit of README-SECTIONS/, tests/, and docs/ confirms everything else is already on current canon. The only residual drift was in the historical planning doc at docs/archive/README-UPDATES-2026-04.md: its banner flagged the Granola note as superseded but left the pre-mogging step numbering (Step 6 Productivity / Step 7 Obsidian / Step 8 Telegram) unaddressed, which could still mislead skimmers. Banner now enumerates the current canon (1 CLI, 2 Bonus, 3 Dev, 4 FidgetFlo, 5 Productivity, 6 Telegram, 7 GitHub+/gitfix, 8 Safety Check, Final Status Line) and clarifies that Obsidian MCP now lives in 2ndBrain-mogging and Granola installs under current Step 5 option 2. No changes required in README-SECTIONS/cheat-sheet.md, step-ordering.md, mcp-setup.md, tests/install-flow-walkthrough.md, or tests/g2-fullscreen-fix.md — all five were already correct after the two prior swarm passes.
1 parent d685d87 commit bc63e76

1 file changed

Lines changed: 5 additions & 1 deletion

File tree

docs/archive/README-UPDATES-2026-04.md

Lines changed: 5 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -1,6 +1,10 @@
11
# README Updates -- Post-Install Review
22

3-
> **Status: COMPLETED — historical planning doc.** All recommendations below have been merged into README.md. Kept for reference. The observations about Step 6 and Granola are superseded by the 2026-04-14 Step 6 overhaul: Step 6 now installs Notion, Granola, n8n, Google Calendar, Morgen, and Motion Calendar (Obsidian MCP moved to Step 7 where the vault is set up).
3+
> **Status: COMPLETED — historical planning doc.** All recommendations below have been merged into README.md. Kept for reference.
4+
>
5+
> **Step numbers in this file are historical (pre-mogging layout).** The body still reads "Step 6 = Productivity Tools, Step 7 = vault / Obsidian, Step 8 = Telegram". The current canon is: **Step 1** CLI Tools · **Step 2** Bonus Software (Ghostty + Arc) · **Step 3** Developer & Utility Tools · **Step 4** FidgetFlo · **Step 5** Productivity Tools (10 MCPs) · **Step 6** Telegram · **Step 7** GitHub + `/gitfix` · **Step 8** Safety Check · **Final** Status Line. Obsidian MCP has moved out of this repo entirely into [2ndBrain-mogging](https://github.com/lorecraft-io/2ndBrain-mogging).
6+
>
7+
> The observations about Step 6 and Granola below are also superseded by the 2026-04-14 Step 6 overhaul and subsequent renumbering: Granola is now installed by **Step 5** (option 2 in the Productivity menu), alongside Notion, n8n, Google Calendar, Morgen, Motion Calendar, Playwright, SwiftKit, Superhuman, and Google Drive.
48
59
This document specifies the changes recommended for README.md based on the live install test on a fresh Mac setup (vault at `~/Desktop/2ndBrain`).
610

0 commit comments

Comments
 (0)